Three Ways the nVent ERICO Cadweld Plus Impulse Exothermic Welding Control Unit Improves the Installation Experience
Our Cadweld exothermic welding process was patented in 1938 by professor Charles A. “Pops” Cadwell, and has been evolving and improving ever since. The work of the...
Our Latest Stories


Why Electrical Inspections Are Delayed in Parts of the U.S. [Plus More Electrical Engineering Information]
Inspections are an important and required aspect of the electrical field. They keep buildings up to code, uphold building safety and ultimately limit some liability for engineers and…


The Applications and Limitations of UL 1449 for Surge Protective Devices (SPDs)
In the U.S—with the exception of utility, telecommunications and rail industries—all AC power connected surge protective devices (SPDs) must be installed in accordance with National Electrical Code (NEC). The 2017…