nVent is Your Partner in Rapid Power Restoration
Recover from the Disaster Faster When disaster strikes and power outages occur, utility companies face immense pressure to restore electricity swiftly and efficiently. Utilco (now part of nVent)…
At nVent, we believe that safer systems ensure a more secure world. We connect and protect our customers with inventive electrical solutions.
Recover from the Disaster Faster When disaster strikes and power outages occur, utility companies face immense pressure to restore electricity swiftly and efficiently. Utilco (now part of nVent)…
CHALLENGE A new energy transmission line was installed requiring 5500 square feet of ground mesh for proper grounding and bonding of the high-voltage lines and towers. It also…
CHALLENGE Several challenges were identified in the construction of a new 20/115 kV substation, along with adding the associated telecommunications and distribution lines.They also needed to replace a…
CHALLENGE Existing transmission lines from the 1960’s needed to be replaced in a “sugar sand” soil. The customer needed an efficient-to-install, theft-deterrent grounding solution that would achieve desired…
PROJECT TYPE Utility required appropriate grounding for a new substation including equipotential safety comprised of 4/0 ground grid at 24″ below grade was supplemented by a custom-made nVent…